What checks need to be done after the wet mix shotcrete machine is started?

Date:2020-05-30     Label:

shotcrete machine

wet shotcrete machine

wet mix shotcrete machine

Using a wet mix shotcrete machine, start-up is a step, and only the successful start-up can be put into the normal wet spraying link. Therefore, in order to ensure the successful start of the concrete wet mix shotcrete machine, it must be carefully checked after startup. Let me discuss it for everyone.

1. Check whether the direction of rotation of the concrete wet mix shotcrete machine is correct. If there is a reverse rotation, adjust the wiring position of the main motor.

2. Check whether the lubricating oil reaches all lubrication parts.

3. Check whether the pressure of the hydraulic oil gauge of the concrete wet mix shotcrete machine is normal (no more than 5MPa under no load).

4. Put the handle in the forward position (near the operator's side), observe whether the movement of each cylinder is in place, and whether the S tube swing is in place.

After the concrete wet mix shotcrete machine is started, after completing the above checks, if everything is OK, the entire start-up work is completed, you can put it into the normal wet spraying link!

What checks need to be done after the wet mix shotcrete machine is started

+

+