The wet shotcrete machine plays a key role in improving construction quality and construction efficiency, and has become a very high efficiency rate substitute for human labor in construction operations. The wet shotcrete machine is suitable for the exterior wall plastering spray coating in the construction industry, the external wall insulation material mortar spraying, the mortar pulling, the large-area spraying of the building, the waterproofing agent spraying and the like. It is multi-purpose and can spray mortar and paint without being affected by regional and environmental conditions and the shape of the sprayed surface.

Introduction to the six characteristics of the wet shotcrete machine:

1. Adapt to spray material: wet cement concrete
2. Adjust the flow rate to adjust the spray effect.
3. In addition to the switch on the electric control box, it is also equipped with a remote control switch.
4. The connection between the gun and the feed tube can be rotated for easy operation.
5. High construction efficiency and good quality.
6. Small size, easy to carry on site.

Wet shotcrete machine operation steps and requirements:

1. Before each shift, press the oil pump several times to fill the transmission part.
2. After turning on the power, first start the main motor, check whether the rubber conveying spiral rotation direction is consistent with the direction indicated by the arrow. If it is inconsistent, the power phase line should be exchanged. Note that this check is performed each time the power is turned back on.
3. Connect the hose and nozzle. Add 5 liters of clean water to the hopper, start the motor and pump out the water to wet the hopper, pump body and conveying hose. After pumping most of the water out, you can stop it.
4. Add the proportioned mortar (or paint) to the hopper, start the air compressor and the damper, and start spraying.
5. After the work is finished, immediately drain the remaining material in the hopper, and inject enough water into the hopper to thoroughly clean the hopper, and then pump it out to clean the hose and nozzle until the pump is full of clean water. Only after the cleaning is over. In order to avoid the condensation of the remaining material in the hopper, hose and nozzle, plugging the hose and the nozzle, affecting the service life of the wet shotcrete equipment.

+

+