Dry sprayer preparation before starting

Date:2019-08-06     Label:

Shotcrete Machine

Gunite Machine

wet shotcrete machine

First of all, check whether the connecting parts of the shotcrete machine are firm, and whether the rotating parts are flexible and reliable.

Observe the cursor and check if the lubricating oil in the gearbox is sufficient.

The drive motor is connected to the power supply, and the jog motor observes that the rotation direction of the rotary font should be consistent with the direction of the arrow. Otherwise, the power supply should be phase-modulated.

The main gas path, the upper gas path, the lower gas path, the vibrator gas path, and the nozzle water supply shut-off valve are in a closed state, and the main gas pipe is connected to the gas source. The water supply pipeline is connected to the water source, and the feed pipe is connected to the host.

+

+