How to properly operate a dry shotcrete machine? China coal slurry machine manufacturers will introduce in detail the preparations before starting the dry spraying machine. I hope it will be helpful for everyone to operate the dry shotcrete machine.
1. First, check whether the connecting parts of the shotcrete machine are firm, and whether the rotary sliding parts are flexible and reliable.
2. Observe the vernier and check if the lubricant in the gearbox is sufficient.
3. The drive motor is connected to the power supply. The direction of the rotation of the font should be the same as that of the arrow.
4. The main gas path, the upper gas path, the lower gas path, the vibrator gas path, and the nozzle water supply stop valve are closed, and the main gas pipe is connected to the air source. The water supply pipeline is connected to the water source, and the feed pipe is connected to the host.
5. Adjust the compaction mechanism, pre-compact manually, then tighten with a wrench, bend the feeding tube, open the main gas path, upper gas path stop valve, and observe that the pressure gauge is around 0.3Mpa gas escaping.