Mechanical products must not only have the correct startup steps but also the correct shutdown steps, which is also very useful for the operator and responsible for their own personal safety. The wet mix shotcrete machine must be properly shut down after the work is completed Steps to protect the spray equipment and ensure the safety of the operator's construction.
At the same time, the grounding distance of the power cord must be a certain distance from the operator, and also pay attention to these connectors.The purpose is to check whether the power head is grounded.
At the same time, whether the distance between wet mix shotcrete machine and the product spraying area is above the above distance. The power cord should not be too long. The length of the power cord is mainly related to the length of the extended extension cord. The extension line of the spraying machine is controlled within 90 meters. For the power plug on the power line, the operator can not remove it at will, so that the operation can ensure the personal safety of the operator!