Only four steps to save time and effort for concrete wet mix shotcrete machine maintenance and maintenance.
1. Before each startup of the shotcrete machine, check whether the injector hole in the air ring sleeve is blocked, and clean the concrete residue in each small hole.
2. The butter should be filled up before each shotcrete operation, in order to ensure sufficient lubrication and reduce shotcrete machine wear.
3. Before starting the wet shotcrete machine, the water tank of the pump cylinder needs to be filled with water, so as to prevent the cylinder from being damaged due to excessive temperature during operation.
4. When the wet mix shotcrete machine is running, the hydraulic oil level should be observed from time to time, and attention must be paid to ensure the cooling of the hydraulic oil during operation.