ban
Position:Home  /  Product Wiki   /  What is The Correct Shutdown Procedure After the Wet Shotcrete Machine Completes the Spry Job?

What is The Correct Shutdown Procedure After the Wet Shotcrete Machine Completes the Spry Job?

Date:2018-11-23     Label:

Shotcrete Machine

Wet Shotcrete Machine

Shotcrete Machine Suppliers


After wet shotcrete machine finished, it must have the correct shutdown steps, which can protect the machine and ensure the safety of operators. Before operators closes the wet shotcrete machine, the voltage of the wet shotcrete machine must be measured. The operator must use a professional voltmeter to measure the parameters of the pressure spray released by the wet shotcrete machine. The normal voltage should be between two hundred volts and two hundred and fifty volts. Under such a voltage condition, the normal shutdown can be performed. At the same time, the grounding distance of the power line must be a certain distance from the operator. The power line should not be too long. The length of the power line is mainly related to the length of the extension cord after its extension. The extension cord's length of wet shotcrete machine should be controlled within 90 meters. In order to protect the safety of operators, operators cannot remove the power plug on the power cord.


+

+

Please leave a message
skype
message