How To Debug The Shotcrete Machine Before Starting?

Date:2019-12-13     Label:

Shotcrete Machine

Shotcrete Machine Debug

If we buy a new shotcrete machine, are there any precautions before using it? In fact, it is inevitable that newly purchased machines should be checked regularly before being put into use, so as to ensure the stable operation of the equipment. So in order to avoid everyone's worries, let's talk about the debugging method of the newly purchased shotcrete machine equipment before starting.

1. First, you need to check whether the contacts of the various circuits of the electric control system of the shotcrete machine equipment are firm and whether there is any leakage.

2. Check the oil window. Is the lubricating oil in the reducer sufficient? The sufficient standard is that the lubricating oil reaches half of the oil window.

3. Check whether the connection of each part of the shotcrete machine equipment is correct and firm.

4. You can try to make the equipment run for a short time and look at the rotation of the equipment, especially pay attention to whether the direction of operation of the shotcrete machine is consistent with the arrow. However, the idling time must not be long to avoid damage to the equipment.

5. Finally, check the pressing force exerted by the pressing mechanism on the rubber plate. The inspection method of this step is to first move the nut wrench on the lever of the pressing device, preliminary compression, and then tighten 2 to 3 turns Until there is no air leak at the rubber plate.